Contact

Post:

CIVIL AVIATION AUTHORITY OF MALAYSIA
AERONAUTICAL INFORMATION SERVICES
LEVEL 2, WEST WING TERMINAL NORTH
JALAN CTA 3
KUALA LUMPUR INTERNATIONAL AIRPORT
64000 KLIA, SEPANG
SELANGOR DARUL EHSAN

Tel: 6-03-8529 1318

Fax: 6-03-8529 1310

AFS: WMKKYAYS

Email: ais@caam.gov.my

URL: aip.caam.gov.my

AIP Supplement for Malaysia

AIRAC AIP SUP

46/2023

Effective from 25 JAN 2024

to 30 JUN 2024

Published on 14 DEC 2023

  
SUBANG / SULTAN ABDUL AZIZ SHAH AERODROME (WMSA)
PAVEMENT IMPROVEMENTS WORKS

1.  The following temporary changes concerning Subang Aerodrome (WMSA) will take place due to main apron improvements works from 01 February 2024 until 30 June 2024 EST. The improvement works will be divided into several stages.

2.  During Stage 1A, Taxiway P, Partial of Apron Taxiway, Aircraft Stand Taxilane P1, Bay 29, Bay 30, Bay 31, Bay 32, Bay 33, Bay 34 and Bay 35 will be in operation. Taxiway N, Partial of Apron Taxiway, Aircraft Stand Taxilane N1, Bay 36, Bay 36A, Bay 36B, Bay 37 and Bay 38 will be closed for pavement improvement works.

3.  During Stage 1B, Taxiway N, Taxiway P, Partial of Aircraft Stand Taxilane N1, Aircraft Stand Taxilane P1, Bay 29, Bay 30, Bay 31, Bay 32, Bay 33, Bay 34 and Bay 35 will be in operation. Areas at Bay 36, Bay 36A and Bay 36B (Existing) will be in operation and replaced with new bay numbers. Partial of Aircraft Stand Taxilane N1, Bay 37 and Bay 38 will be closed for pavement improvement works.

4.  During Stage 2, Taxiway N, Taxiway P, Aircraft Stand Taxilane N1, Aircraft Stand Taxilane P1, Partial of Apron Taxiway, Bay 29, Bay 30, Bay 31 and Bay 32 will be in operation. Areas at Bay 37 and Bay 38 (Existing) will be in operation and replaced with new bay numbers. Partial of Apron taxiway, Bay 33, Bay 34 and Bay 35 will be closed for pavement improvement works.

5.  During Stage 3A, Taxiway N, Taxiway P, Apron Taxiway and Aircraft Stand Taxilane N1 will be in operation. Areas at Bay 34 and Bay 35 (Existing) will be in operation and replaced with new bay numbers. Aircraft Stand Taxilane P1, Bay 29, Bay 30, Bay 31 Bay 32 and Bay 33 will be closed for pavement improvement works.

6.  During Stage 3B, Taxiway N, Taxiway P, Apron Taxiway and Aircraft Stand Taxilane N1 and Partial of Aircraft Stand Taxilane P1 will be in operation. Area at Bay 33 (Existing) will be in operation and replaced with new bay numbers. Partial of Aircraft Stand Taxilane P1, Bay 29, Bay 30, Bay 31 and Bay 32 will be close.

7.  During Stage 3C, Taxiway N, Taxiway P, Apron Taxiway and Aircraft Stand Taxilane N1, Partial of Aircraft Stand Taxilane P1 will be in operation. Areas at Bay 31 and Bay 32 (Existing) will be in operation and replaced with new bay numbers. Partial of Aircraft Stand Taxilane P1, Bay 29 and Bay 30 will be closed for pavement improvement works.d for pavement improvement works.

8.  Details of the bay and taxiway closure will be mentioned in the remarks.

9.  New bay numbers with aircraft stand coordinates (WGS-84) for operation at the main apron area will be notified in NOTAM.

WMSA AD 2.8 APRONS, TAXIWAYS AND CHECK LOCATION/POSITIONS DATA

6Remarks

STAGE 1A

Taxiway N, Partial of Apron Taxiway, Aircraft Stand Taxilane N1, Bay 36, Bay 36A, Bay 36B, Bay 37 and Bay 38 U/S FM 20240201 TIL 20240314 EST

STAGE 1B

Partial of Aircraft Stand Taxilane N1, Bay 37 and Bay 38 U/S FM 20240315 TIL 20240408 EST

STAGE 2

Partial of Apron taxiway, Bay 33, Bay 34 and Bay 35 U/S FM 20240409 TIL 20240517 EST

STAGE 3A

Aircraft Stand Taxilane P1, Bay 29, Bay 30, Bay 31 Bay 32 and Bay 33 U/S FM 20240518 TIL 20240606 EST

STAGE 3B

Partial of Aircraft Stand Taxilane P1, Bay 29, Bay 30, Bay 31 and Bay 32 U/S FM 20240607 TIL 20240612 EST

STAGE 3C

Partial of Aircraft Stand Taxilane P1, Bay 29 and Bay 30 U/S FM 20240613 TIL 20240619 EST

WMSA AD 2.9 SURFACE MOVEMENT GUIDANCE AND CONTROL SYSTEM AND MARKINGS (ADDITIONAL)

4Remarks

TWY N EDGE & CL LGT U/S FM 20240201 TIL 20240314 EST

WMSA AD 2.15 OTHER LIGHTING, SECONDARY POWER SUPPLY (ADDITIONAL)

3TWY edge and centre line lighting

TWY N EDGE & CL LGT U/S FM 20240201 TIL 20240314 EST

WMSA AD 2.20 LOCAL AERODROME REGULATIONS (ADDITIONAL)

2.20.7 Taxiing to and from stands

2.20.7.1 No aircraft movement is allowed at closed portions of apron taxiway, aircraft stand taxilane, parking bays and taxiway.

2.20.7.2 The routes to be used by aircraft when taxiing into, on and out of the apron will be specified by ATC. The issuance of a taxi route by ATC does not relieve the pilot-in-command of the responsibility to maintain separation with other aircraft in the movement area or to comply with ATC directions intended to regulate aircraft movement.

2.20.7.3 Pilots are advised to take note of the precautions on the presence of open excavation, workers, construction materials and construction equipment, particularly when taxiing adjacent to the apron and aircraft bays/stand while works within the cordoned/barricaded areas are in progress.

*****

10.  Refer charts below for additional information.

  1. STAGE 1A

    APPENDIX A1: Aircraft Parking/Docking Chart-ICAO

    APPENDIX A2: Aerodrome Ground Movement Chart-ICAO

  2. STAGE 1B

    APPENDIX B1: Aircraft Parking/Docking Chart-ICAO

    APPENDIX B2: Aerodrome Ground Movement Chart-ICAO

  3. STAGE 2

    APPENDIX C1: Aircraft Parking/Docking Chart-ICAO

    APPENDIX C2: Aerodrome Ground Movement Chart-ICAO

  4. STAGE 3A

    APPENDIX D1: Aircraft Parking/Docking Chart-ICAO

    APPENDIX D2: Aerodrome Ground Movement Chart-ICAO

  5. STAGE 3B

    APPENDIX E1: Aircraft Parking/Docking Chart-ICAO

    APPENDIX E2: Aerodrome Ground Movement Chart-ICAO

  6. STAGE 3C

    APPENDIX F1: Aircraft Parking/Docking Chart-ICAO

    APPENDIX F2: Aerodrome Ground Movement Chart-ICAO

11.  Any updates, changes and cancellation of this AIRAC AIP SUP will be notified by NOTAM.

12.  This AIRAC AIP SUP will remain in force until the works are complete on 30 June 2024 EST.

- END -

Figure 1. APPENDIX A1 46/2023
PDF../graphics/257213.pdf
Figure 2. APPENDIX A2 46/2023
PDF../graphics/257219.pdf
Figure 3. APPENDIX B1 46/2023
PDF../graphics/257214.pdf
Figure 4. APPENDIX B2 46/2023
PDF../graphics/257221.pdf
Figure 5. APPENDIX C1 46/2023
PDF../graphics/257215.pdf
Figure 6. APPENDIX C2 46/2023
PDF../graphics/257222.pdf
Figure 7. APPENDIX D1 46/2023
PDF../graphics/257216.pdf
Figure 8. APPENDIX D2 46/2023
PDF../graphics/257224.pdf
Figure 9. APPENDIX E1 46/2023
PDF../graphics/257217.pdf
Figure 10. APPENDIX E2 46/2023
PDF../graphics/257225.pdf
Figure 11. APPENDIX F1 46/2023
PDF../graphics/257218.pdf
Figure 12. APPENDIX F2 46/2023
PDF../graphics/257226.pdf