Contact

Post:

CIVIL AVIATION AUTHORITY OF MALAYSIA
AERONAUTICAL INFORMATION SERVICES
LEVEL 2, WEST WING TERMINAL NORTH
JALAN CTA 3
KUALA LUMPUR INTERNATIONAL AIRPORT
64000 KLIA, SEPANG
SELANGOR DARUL EHSAN

Tel: 6-03-8529 1318

Fax: 6-03-8529 1310

AFS: WMKKYAYS

Email: ais@caam.gov.my

URL: aip.caam.gov.my

AIP Supplement for Malaysia

AIP SUP

36/2023

Effective from 01 DEC 2023

to 31 DEC 2024

Published on 11 OCT 2023

  KOTA BHARU / SULTAN ISMAIL PETRA AIRPORT (WMKC)
UPGRADING WORKS

(This AIP Supplement replaces AIRAC AIP Supplement 02/2022)

1.  The following temporary changes concerning Kota Bharu Aerodrome (WMKC) will take place due to upgrading works from 01 DEC 2023 until 31 DEC 2024 EST. Upgrading works will be divided into 2 Phases. Phase 2A will take place from 01 DEC 2023 until 01 JUN 2024 EST. Phase 2B will take place from 02 JUN 2024 until 31 DEC 2024 EST.

2.  During Phase 2A and Phase 2B, new Bay 6, Bay 7, Bay 8, Bay 9, Bay 10 and Bay 11/Bay 11A will be in operation. Bay 1, Bay 2, Bay 3, Bay 4 and Bay 5 will be closed for upgrading works.

3.  During Phase 2A and Phase 2B, new Taxiway E (Extension), Apron Taxiway J, Taxiway L and Taxiway L1 will be in operation. During Phase 2A, Taxiway A will be closed for upgrading works and during Phase 2B, Taxiway B will be closed for upgrading works. Details of the taxiway closure will be mentioned in the remarks.

WMKC AD 2.8 APRONS, TAXIWAYS AND CHECK LOCATION/POSITIONS DATA
1

Apron surface and strength

BAY 6, BAY 7, BAY 8, BAY 9, BAY 10, BAY 11, and BAY 11A

Surface: Concrete (Rigid)

Strength: PCN 67/R/B/X/T

2

Taxiway width, surface and strength

TWY A

Width: 25 M

Surface: Asphalt (Flexible)

Strength: PCN 51/F/A/W/T

TWY A1

Width: 18 M

Surface: Asphalt (Flexible)

Strength: PCN 58/F/B/X/T

TWY B

Width: 26 M

Surface: Asphalt (Flexible)

Strength: PCN 51/F/A/W/T

TWY D

Width: 17 M

Surface: Asphalt (Flexible)

Strength: PCN 51/F/A/W/T

TWY E

Width: 18 M

Surface: Asphalt (Flexible)

Strength: PCN 51/F/A/W/T

  

TWY E (EXT.)

Width: 18 M

Surface: Asphalt (Flexible)

Strength: PCN 58/F/B/X/T

TWY F

Width: 14 M

Surface: Asphalt (Flexible)

Strength: PCN 51/F/A/W/T

TWY G

Width: 21 M

Surface: Asphalt (Flexible)

Strength: PCN 51/F/A/W/T

TWY H

Width: 13 M

Surface: Asphalt (Flexible)

Strength: PCN 51/F/A/W/T

TWY L & L1

Width: 18 M

Surface: Asphalt (Flexible)

Strength: PCN 58/F/B/X/T

APRON TAXIWAY J

Width: 18 M

Surface: Concrete (Rigid)

Strength: PCN 67/R/B/X/T

5Remarks

PHASE 2A & PHASE 2B

APRON BAY 1, 2, 3, 4, 5 U/S FM 20231201 TIL 20241231 EST

NEW APRON BAY 6,7,8, 9, 10, 11/11A FM 20231201 TIL PERM

TWY C U/S FM 20231201 TIL 20241231 EST

PHASE 2A

TWY A & A1 U/S FM 20231201 TIL 20240601 EST

PHASE 2B

TWY B & B1 U/S FM 20240602 TIL 20241231 EST

TWY E (FM TWY B TO TWY C) U/S FM 20240602 TIL 20241231

WMKC AD 2.9 SURFACE MOVEMENT GUIDANCE AND CONTROL SYSTEM AND MARKINGS
4Remarks

TWY LGT TWY C U/S FM 20231201 TIL 20241231 EST

Visual docking and guidance system for Bay 1, 2 & 3 U/S FM 20231201 TIL 20241231 EST

New visual docking and guidance system for Bay 6, 7 & 8 FM 20231201 TIL PERM

  WMKC AD 2.10 AERODOME OBSTACLES (ADDITIONAL)

In Area 3
OBST ID/DesignationOBST typeOBST
position
ELEV/HGTMarkings/Type, colourRemarks
abcdef
TC-4Tower crane061011.42N 1021732.61E5.0/40.35 MLGTD R

Crane jib reach 66 M

Obstacle in position FM 20231101 TIL 20241231 EST

TC-5Tower crane061012.09N 1021736.57E5.0/33.03 MLGTD R

Crane jib reach 65 M

Obstacle in position FM 20231101 TIL 20241231 EST

TC-6Tower crane061010.48N 1021734.61E5.0/31.1 MLGTD R

Crane jib reach 56 M

Obstacle in position FM 20231101 TIL 20241231 EST

TC-7Tower crane061008.18N 1021739.72E4.5/31.1 MLGTD R

Crane jib reach 50 M

Obstacle in position FM 20231101 TIL 20241231 EST

  WMKC AD 2.15 OTHER LIGHTING, SECONDARY POWER SUPPLY

3 TWY edge and centre line lighting

PHASE 2A & PHASE 2B

TWY C EDGE & CL LGT U/S FM 20231201 TIL 20241231 EST

PHASE 2A

TWY A EDGE & CL LGT U/S FM 20231201 TIL 20240601 EST

PHASE 2B

TWY B EDGE & CL LGT U/S FM 20240602 TIL 20241231 EST

TWY E EDGE (FM TWY B TO TWY C) U/S FM 20241231

   WMKC AD 2.19 RADIO NAVIGATION AND LANDING AIDS

Type of aid, MAG VAR, CAT of ILS/MLS (for VOR/ILS/MLS, give declination)IDFrequencyHours of
operation
Position of transmitting antenna
coordinates
Elevation of DME
transmitting antenna
Remarks
1234567
VOR/DMEVKB112.300 MHz-060948.42N 1021851.17E40 FT-
LOC-109.300 MHz-060950.90N 1021832.10E-Localizer Course
Bearing: 279° 37’ 20" T/ 279° 49’ 55" M U/S FM 20230602 TIL 20231231 EST
GP/DMEIKB332.000 MHz CH 30X-061000.1N 1021714.6E-U/S FM 20230602 TIL 20231231 EST
WMKC AD 2.20 LOCAL TRAFIC REGULATIONS (ADDITIONAL)
2. Taxiing to and from stands
No aircraft movement is allowed at closed portions of apron taxiway, aircraft stand taxi lane, parking bays and taxiways. The routes to be used by aircraft when taxiing into, on and out of the apron will be specified by ATC. The issuance of taxi route by ATC does not relieve the pilot-in-command of the responsibility to maintain separation with other aircraft on the movement area or to comply with ATC directions intended to regulate aircraft movement. Pilots are advised to take note of the precautions on the presence of open excavation, workers, construction materials and construction equipment, particularly when taxiing adjacent to the apron and aircraft bays/stand while works within the cordoned/barricaded areas are in progress. During Phase 2A & Phase 2B, new Bay 6, Bay 7 and Bay 8 shall operate for A20N/A21N, B738/B739 aircraft. New Bay 9 shall operate for A20N/A21N, B738/B739 and AT75/AT76 aircraft. New Bay 10 and Bay 11 shall operate for AT75/AT76 aircraft. All bays shall be Power-In Push-Back operation. Bay 11A shall operate for B738/B739 and Power-In Power-Out operation.

*****

4.  Refer APPENDIX A: Aircraft Parking/Docking Chart-ICAO (Phase 2A) and APPENDIX B: Aerodrome Ground Movement Chart-ICAO (Phase 2A), APPENDIX C: Aircraft Parking/Docking Chart-ICAO (Phase 2B) and APPENDIX D: Aerodrome Ground Movement Chart-ICAO (Phase 2B), for additional information.

5.  This AIP SUP supersedes AIRAC AIP SUP 02/2022 dated 07 APR 2022 and will remain in force until the works are complete on 31 DEC 2024 EST.

- END -

Figure 1. APPENDIX A 36/2023
PDF../graphics/255942.pdf
Figure 2. APPENDIX B 36/2023
PDF../graphics/255943.pdf
Figure 3. APPENDIX C 36/2023
PDF../graphics/255944.pdf
Figure 4. APPENDIX D 36/2023
PDF../graphics/255945.pdf