ContactPost: CIVIL AVIATION AUTHORITY OF MALAYSIA Tel: 6-03-8529 1318 Fax: 6-03-8529 1310 AFS: WMKKYAYS Email: ais@caam.gov.my URL: aip.caam.gov.my | AIP Supplement for Malaysia | AIP SUP 36/2023 Effective from 01 DEC 2023 to 31 DEC 2024 Published on 11 OCT 2023 |
1. The following temporary changes concerning Kota Bharu Aerodrome (WMKC) will take place due to upgrading works from 01 DEC 2023 until 31 DEC 2024 EST. Upgrading works will be divided into 2 Phases. Phase 2A will take place from 01 DEC 2023 until 01 JUN 2024 EST. Phase 2B will take place from 02 JUN 2024 until 31 DEC 2024 EST.
2. During Phase 2A and Phase 2B, new Bay 6, Bay 7, Bay 8, Bay 9, Bay 10 and Bay 11/Bay 11A will be in operation. Bay 1, Bay 2, Bay 3, Bay 4 and Bay 5 will be closed for upgrading works.
3. During Phase 2A and Phase 2B, new Taxiway E (Extension), Apron Taxiway J, Taxiway L and Taxiway L1 will be in operation. During Phase 2A, Taxiway A will be closed for upgrading works and during Phase 2B, Taxiway B will be closed for upgrading works. Details of the taxiway closure will be mentioned in the remarks.
1 |
Apron surface and strength |
BAY 6, BAY 7, BAY 8, BAY 9, BAY 10, BAY 11, and BAY 11A Surface: Concrete (Rigid) Strength: PCN 67/R/B/X/T |
2 |
Taxiway width, surface and strength |
TWY A Width: 25 M Surface: Asphalt (Flexible) Strength: PCN 51/F/A/W/T TWY A1 Width: 18 M Surface: Asphalt (Flexible) Strength: PCN 58/F/B/X/T TWY B Width: 26 M Surface: Asphalt (Flexible) Strength: PCN 51/F/A/W/T TWY D Width: 17 M Surface: Asphalt (Flexible) Strength: PCN 51/F/A/W/T TWY E Width: 18 M Surface: Asphalt (Flexible) Strength: PCN 51/F/A/W/T |
TWY E (EXT.) Width: 18 M Surface: Asphalt (Flexible) Strength: PCN 58/F/B/X/T TWY F Width: 14 M Surface: Asphalt (Flexible) Strength: PCN 51/F/A/W/T TWY G Width: 21 M Surface: Asphalt (Flexible) Strength: PCN 51/F/A/W/T TWY H Width: 13 M Surface: Asphalt (Flexible) Strength: PCN 51/F/A/W/T TWY L & L1 Width: 18 M Surface: Asphalt (Flexible) Strength: PCN 58/F/B/X/T APRON TAXIWAY J Width: 18 M Surface: Concrete (Rigid) Strength: PCN 67/R/B/X/T | ||
5 | Remarks |
PHASE 2A & PHASE 2B APRON BAY 1, 2, 3, 4, 5 U/S FM 20231201 TIL 20241231 EST NEW APRON BAY 6,7,8, 9, 10, 11/11A FM 20231201 TIL PERM TWY C U/S FM 20231201 TIL 20241231 EST PHASE 2A TWY A & A1 U/S FM 20231201 TIL 20240601 EST PHASE 2B TWY B & B1 U/S FM 20240602 TIL 20241231 EST TWY E (FM TWY B TO TWY C) U/S FM 20240602 TIL 20241231 |
4 | Remarks |
TWY LGT TWY C U/S FM 20231201 TIL 20241231 EST Visual docking and guidance system for Bay 1, 2 & 3 U/S FM 20231201 TIL 20241231 EST New visual docking and guidance system for Bay 6, 7 & 8 FM 20231201 TIL PERM |
In Area 3 | |||||
---|---|---|---|---|---|
OBST ID/Designation | OBST type | OBST position | ELEV/HGT | Markings/Type, colour | Remarks |
a | b | c | d | e | f |
TC-4 | Tower crane | 061011.42N 1021732.61E | 5.0/40.35 M | LGTD R |
Crane jib reach 66 M Obstacle in position FM 20231101 TIL 20241231 EST |
TC-5 | Tower crane | 061012.09N 1021736.57E | 5.0/33.03 M | LGTD R |
Crane jib reach 65 M Obstacle in position FM 20231101 TIL 20241231 EST |
TC-6 | Tower crane | 061010.48N 1021734.61E | 5.0/31.1 M | LGTD R |
Crane jib reach 56 M Obstacle in position FM 20231101 TIL 20241231 EST |
TC-7 | Tower crane | 061008.18N 1021739.72E | 4.5/31.1 M | LGTD R |
Crane jib reach 50 M Obstacle in position FM 20231101 TIL 20241231 EST |
3 | TWY edge and centre line lighting |
PHASE 2A & PHASE 2B TWY C EDGE & CL LGT U/S FM 20231201 TIL 20241231 EST PHASE 2A TWY A EDGE & CL LGT U/S FM 20231201 TIL 20240601 EST PHASE 2B TWY B EDGE & CL LGT U/S FM 20240602 TIL 20241231 EST TWY E EDGE (FM TWY B TO TWY C) U/S FM 20241231 |
Type of aid, MAG VAR, CAT of ILS/MLS (for VOR/ILS/MLS, give declination) | ID | Frequency | Hours of operation | Position of transmitting antenna coordinates | Elevation of DME transmitting antenna | Remarks |
1 | 2 | 3 | 4 | 5 | 6 | 7 |
VOR/DME | VKB | 112.300 MHz | - | 060948.42N 1021851.17E | 40 FT | - |
LOC | - | 109.300 MHz | - | 060950.90N 1021832.10E | - | Localizer Course Bearing: 279° 37’ 20" T/ 279° 49’ 55" M U/S FM 20230602 TIL 20231231 EST |
GP/DME | IKB | 332.000 MHz CH 30X | - | 061000.1N 1021714.6E | - | U/S FM 20230602 TIL 20231231 EST |
4. Refer APPENDIX A: Aircraft Parking/Docking Chart-ICAO (Phase 2A) and APPENDIX B: Aerodrome Ground Movement Chart-ICAO (Phase 2A), APPENDIX C: Aircraft Parking/Docking Chart-ICAO (Phase 2B) and APPENDIX D: Aerodrome Ground Movement Chart-ICAO (Phase 2B), for additional information.
5. This AIP SUP supersedes AIRAC AIP SUP 02/2022 dated 07 APR 2022 and will remain in force until the works are complete on 31 DEC 2024 EST.
- END -