Contact

Post:

CIVIL AVIATION AUTHORITY OF MALAYSIA
AERONAUTICAL INFORMATION SERVICES
AIR TRAFFIC CONTROL TOWER (TOWER WEST)
JALAN KLIA 2/4,
64000 KLIA,
SELANGOR DARUL EHSAN
MALAYSIA.

Tel: 6-03-8778 4106

Email: ais@caam.gov.my

URL: aip.caam.gov.my

AIP Supplement for Malaysia

AIP SUP

09/26

Effective Date: 22 JAN 2026

Publication Date: 22 JAN 2026

  PENANG INTERNATIONAL AIRPORT (WMKP)RESTRICTION OF FLYING TRAINING SCHOOL AIRCRAFT OPERATIONS

1  INTRODUCTION

1.1  This AIP Supplement is issued to notify all operators regarding a restriction of flying training school aircraft operations at Penang International Airport (WMKP) due to the ongoing airport expansion works.

2  SCOPE OF RESTRICTION

2.1  From 5th December 2025 to 1600 UTC on 31st December 2028, the following operations by flying school aircraft are not permitted at WMKP:

  1. Landing

  2. Take off

  3. Touch-and-Go

  4. Circuit training

3  REASON OF RESTRICTION

3.1  This restriction is required due to airport expansion works, which result in partial closure of manoeuvring areas, reduced runway/apron availability and operational constraints during the construction period.

4  AFFECTED AIRSPACE

4.1  WMKP aerodrome and associated circuit patterns.

5  APPLICABILITY

5.1  This restriction applies to all flying training organisations (FTO), private pilot training activities,
ab-initio training aircraft and circuit operations.

6  CONTACTS

Name:Mohd Ridzuan Bin Ahmad Walid
Designated:Head of Operations, MASB, Penang International Airport (WMKP)
Telephone No:+604-2520 252
Email :ridzuanaw@malaysiaairports.com.my

7  VALIDITY

7.1  This AIP Supplement supersedes NOTAM A5431/25 and will remain in force until the works are complete on 31st December 2028 (1600 UTC). Any updates, changes and cancellation of this AIP Supplement will be notified through NOTAM