Civil Aviation Authority Of Malaysia provides a range of aeronautical charts for use by all types of civil aviation. The Aeronautical Information Services produces some of the charts which are part of the AIP.
The charts published in the AIP are produced in accordance with the provisions contained in the ICAO documents listed below:
Annex 4 - Aeronautical Charts.
DOC 8168 OPS/611 - Aircraft Operations Vol ll.
DOC 8697 AN/889 - Aeronautical Chart Manual.
The charts as listed under paragraph 3.2.5 of this subsection may be obtained from:
Aeronautical Information Services,
Air Traffic Management Division
Civil Aviation Authority Of Malaysia (CAAM)
Kuala Lumpur Air Traffic Control Centre (KLATCC)
Level 1 & 2 West Wing Terminal North, Jalan CTA 3
Kuala Lumpur International Airport
64000 KLIA, Sepang,Selangor.
Tel: +603 - 8529 1318
Fax: +603 - 8529 1310
Email: ais@caam.gov.my
URL: www.caam.gov.my
URL: aip.caam.gov.my
Aerodrome Chart - ICAO
Aerodrome Obstacle Chart - ICAO Type A (for each runway)
En-Route Chart - ICAO
Standard Departure Chart - Instrument (SID) - ICAO
Standard Arrival Chart - Instrument (STAR) - ICAO
Instrument Approach Chart - ICAO (for each runway and procedure type)
Precision Approach Terrain Chart - ICAO
World Aeronautical Chart - ICAO
The charts currently available are listed under para 3.2.5 of this subsection.
Aerodrome Chart - ICAO
The chart provides flight crews with information that will facilitate the ground movement of aircraft to and from the runways and apron and to portray the major flight operation facilities at the aerodrome.
Aerodrome Obstacle Chart - ICAO Type A (operating limitations)
This chart contains detailed information on obstacles in the take-off flight path areas of aerodrome. It is shown in plan and profile view. This obstacle information, provides the data necessary to enable an operator to comply with the operating limitations of ICAO Annex 6, parts l and ll, Chapter 5.
En-Route Chart - ICAO
This chart is produced for the entire Kuala Lumpur and Kota Kinabalu FIR. The aeronautical data include all aerodromes, prohibited, restricted and danger area and the air traffic services system in detail. The chart provides the flight crew with information that will facilitate navigation along ATS routes in compliance with air traffic services procedures.
Standard Departure Chart - Instrument (SID) - ICAO
This chart is produced whenever a standard departure route - instrument has been established and cannot be shown with sufficient clarity on the Area Chart - ICAO.
The aeronautical data shown include the aerodrome of departure, aerodrome(s) which effect the designated standard departure route - instrument, prohibited, restricted and danger areas and the air traffic services system. This chart provides the flight crew with information that will enable them to comply with the designated standard departure route - instrument from the take-off phase to the en-route phase.
Standard Arrival Chart - Instrument (STAR) - ICAO
This chart is produced whenever a standard arrival route - instrument has been established and cannot be shown with sufficient clarity on the Area Chart - ICAO.
The aeronautical data shown include the aerodrome of landing, aerodrome(s) which effect the designated standard arrival route - instrument, prohibited, restricted and danger areas and the air traffic services system. This chart provides the flight crew with information that will enable them to comply with the designated standard arrival route - instrument from the en-route phase to the approach phase.
Instrument Approach Chart - ICAO (for each runway and procedure type)
This chart is produced for all aerodromes used by civil aviation where instrument approach procedures have been established. A separate Instrument Approach Chart - ICAO has been provided for each approach procedure.
The aeronautical data shown include information on aerodromes, prohibited, restricted and danger areas, radio communication facilities and navigational aids, minimum sector altitude, procedure track portrayed in plan and profile view, aerodrome operating minima, etc.
This chart provides the flight crew with information that will enable them to perform an approved instrument approach procedure to the runway of intended landing including the missed approach procedure and where applicable, associated holding patterns.
Precision Approach Terrain Chart - ICAO
This chart is produced for all runways served by Category II precision approaches.
The chart provides aircraft operating agencies with information to assess the effect of terrain in the approach path on decision height determination by the use of radar altimeter.
World Aeronautical Chart - ICAO 1:1 000 000
This series is constructed on Lambert Conformal Conic Projection with two standard parallels at 0 deg 40 min and 3 deg 20 min.The spheroid is Word Geodetic System 1984 (WGS84).The aeronautical data shown have been kept to a minimum, consistent with the use of the chart for visual air navigation.It includes a selection of aerodromes, significant obstacles, elements of the ATS system, prohibited, restricted and danger areas, and radio navigation aids.The chart provides information to satisfy visual air navigation and is also used as a pre-flight planning chart.
Title of series | Name of Chart | Reference | Date |
---|---|---|---|
Aerodrome Charts - ICAO (AC) | ALOR SETAR | AD 2-WMKA-2-1 |
16 JUL 2024 |
BINTULU | AD 2-WBGB-2-1 | 26 MAY 2022 | |
GONG KEDAK | AD 2-WMGK-2-1 | 29 OCT 2021 | |
IPOH | AD 2-WMKI-2-1 | 28 FEB 2023 | |
JOHOR BAHRU | AD 2-WMKJ-2-1 | 16 JUL 2024 | |
KERTEH | AD 2-WMKE-2-1 | 26 MAR 2020 | |
KL INTERNATIONAL | AD 2-WMKK-2-1 |
11 JUL 2024 | |
KOTA BHARU | AD 2-WMKC-2-1 |
01 DEC 2022 | |
KOTA KINABALU | AD 2-WBKK-2-1 |
03 OCT 2024 | |
KUALA TERENGGANU | AD 2-WMKN-2-1 |
07 NOV 2023 | |
KUANTAN | AD 2-WMKD-2-1 |
07 NOV 2023 | |
KUCHING | AD 2-WBGG-2-1 |
15 AUG 2023 | |
KUDAT | AD 2-WBKT-2-1 | 05 NOV 2020 | |
LAHAD DATU | AD 2-WBKD-2-1 | 28 FEB 2023 | |
LABUAN | AD 2-WBKL-2-1 | 30 JAN 2024 | |
LANGKAWI | AD 2-WMKL-2-1 |
23 FEB 2022 | |
LAWAS | AD 2-WBGW-2-1 |
08 OCT 2024
| |
LIMBANG | AD 2-WBGJ-2-1 | 28 FEB 2023 | |
MALACCA | AD 2-WMKM-2-1 | 28 FEB 2023 | |
MARUDI |
AD 2-WBGM-2-1 | 28 FEB 2023 | |
MIRI | AD 2-WBGR-2-1 |
03 OCT 2024 | |
MUKAH | AD 2-WBGK-2-1 |
08 DEC 2022 | |
PENANG | AD 2-WMKP-2-1 |
16 JUL 2024 | |
PULAU REDANG | AD 2-WMPR-2-1 | 25 MAR 2021 | |
PULAU TIOMAN | AD 2-WMBT-2-1 |
15 SEP 2022 | |
SANDAKAN | AD 2-WBKS-2-1 |
08 DEC 2022 | |
SIBU | AD 2-WBGS-2-1 |
28 FEB 2023 | |
SUBANG | AD 2-WMSA-2-1 |
03 OCT 2024 | |
TAWAU | AD 2-WBKW-2-1 |
07 NOV 2023 | |
MULU | AD 2-WBMU-2-1 | 25 MAR 2021 | |
PULAU PANGKOR | AD 2-WMPA-2-1 | 08 SEP 2022 | |
LONG AKAH | AD 2-WBGA-2-1 | 26 MAR 2020 | |
LONG LELLANG | AD 2-WBGF-2-1 | 26 MAR 2020 | |
LONG SERIDAN | AD 2-WBGI-2-1 | 26 MAR 2020 | |
LONG BANGA | AD 2-WBGL-2-1 | 26 MAR 2020 | |
BAKELALAN | AD 2-WBGQ-2-1 | 26 MAR 2020 | |
BARIO | AD 2-WBGZ-2-1 | 26 MAR 2020 | |
TANJUNG MANIS | AD 2-WBTM-2-1 | 28 FEB 2023 |
Title of series | Name of Chart | Reference | Date |
---|---|---|---|
Aerodrome Obstacle Charts -ICAO - TYPE A (AOC) | BINTULU | AD 2-WBGB-3-1 | 26 MAR 2020 |
JOHOR BAHRU | AD 2-WMKJ-3-1 | 28 MAR 2019 | |
KL INTERNATIONAL (RWY 14L/32R) | AD 2-WMKK-3-1 | 28 MAR 2019 | |
KL INTERNATIONAL (RWY 14R/32L) | AD 2-WMKK-3-3 | 28 MAR 2019 | |
KL INTERNATIONAL (RWY 15/33) | AD 2-WMKK-3-5 | 07 NOV 2019 | |
KOTA BHARU | AD 2-WMKC-3-1 | 13 AUG 2020 | |
KOTA KINABALU | AD 2-WBKK-3-1 |
03 OCT 2024 | |
KUCHING | AD 2-WBGG-3-1 | 20 MAY 2021 | |
LANGKAWI | AD 2-WMKL-3-1 | 07 NOV 2019 | |
LIMBANG | AD 2-WBGJ-3-1 | 16 AUG 2018 | |
LABUAN | AD 2-WBKL-3-1 | 16 AUG 2018 | |
MALACCA | AD 2-WMKM-3-1 | 28 MAR 2019 | |
MIRI | AD 2-WBGR-3-1 |
08 SEP 2022 | |
PENANG | AD 2-WMKP-3-1 | 25 MAR 2021 | |
SUBANG | AD 2-WMSA-3-1 | 28 MAR 2019 | |
ALOR SETAR | AD 2-WMKA-3-1 |
07 NOV 2023 | |
TAWAU | AD 2-WBKW-3-1 | 07 NOV 2019 | |
SIBU | AD 2-WBGS-3-1 | 28 MAR 2019 | |
KUALA TERENGGANU | AD 2-WMKN-3-1 | 16 AUG 2018 | |
KERTEH | AD 2-WMKE-3-1 | 16 AUG 2018 | |
MULU | AD 2-WBMU-3-1 | 13 AUG 2020 |
Title of series | Name of Chart | Reference | Date |
---|---|---|---|
Precision Approach Terrain Chart - ICAO | RWY 14L | AD 2-WMKK-5-1 | 23 MAY 2019 |
RWY 14R | AD 2-WMKK-5-3 | 23 MAY 2019 | |
RWY 32L | AD 2-WMKK-5-5 | 23 MAY 2019 | |
RWY 32R | AD 2-WMKK-5-7 | 23 MAY 2019 |
Title of series | Name of Chart | Reference | Date |
---|---|---|---|
Standard Departure Chart -Instrument - ICAO -SID | ALOR SETAR | ||
RWY 22 TAMOS 1D RIGTO 1D DUBAX 1D SAGEL 1D GUTEB 1D OMBUL 1D AKMIS 1D | AD 2-WMKA-6-1 |
16 JUL 2024 | |
RWY 22 RNAV (GNSS) TAMOS 1B RIGTO 1B DUBAX 1B SAGEL 1B GUTEB 1B OMBUL 1B AKMIS 1B | AD 2-WMKA-6-3 |
16 JUL 2024 | |
BINTULU | |||
RWY 17 RNAV EKETO 1C DUNAS IC NOKER 1C BENLI 1C BASUV 1C ADGAB 1C | AD 2-WBGB-6-1 | 01 DEC 2022 | |
RWY 17 ADGAB 3F EKETO 3F BASUV 3F DUNAS 3F BENLI 3F NOKER 3F |
AD 2-WBGB-6-5 | 01 DEC 2022 | |
RWY 35 RNAV EKETO 1D DUNAS 1D NOKER 1D BENLI 1D BASUV 1D | AD 2-WBGB-6-7 | 01 DEC 2022 | |
RWY 35 ADGAB 3E EKETO 3E BASUV 3E NUNAS 3E BENLI 3E NAKER 3E | AD 2-WBGB-6-11 | 01 DEC 2022 | |
IPOH | |||
RWY 22 RNAV (GNSS) AGRES 2B DUDAD 2B LUTMI 2B | AD 2-WMKI-6-1 | 08 OCT 2024 | |
RWY 22 RNAV (GNSS) AGRES 2B DUDAD 2B LUTMI 2B | AD 2-WMKI-6-3 | 08 OCT 2024 | |
JOHOR BAHRU | |||
RWY 16/34 JOHOR RADAR TWO DEPARTURE |
AD 2-WMKJ-6-1 |
08 DEC 2022 | |
RWY 16 RNAV AROSO 1J ADLOV 1J PIMOK 1J SABKA 1J |
AD 2-WMKJ-6-3 |
08 DEC 2022 | |
RWY 16 RNAV AROSO 2J ADLOV 2J SABKA 2J OMKOM 2J |
AD 2-WMKJ-6-7 |
08 DEC 2022 | |
RWY 34 RNAV AROSO 1K ADLOV 1K PIMOK 1K OMKOM 1K SABKA 1K |
AD 2-WMKJ-6-11 |
08 DEC 2022 | |
RWY 16 AROSO 1L SABKA 1L PIMOK 1L |
AD 2-WMKJ-6-15 |
08 DEC 2022 | |
RWY 16 AROSO 2L ADLOV 2L OMKOM 2L |
AD 2-WMKJ-6-17 |
08 DEC 2022 | |
RWY 34 AROSO 1M ADLOV 1M OMKOM 1M PIMOK 1M SABKA 1M |
AD 2-WMKJ-6-19 |
08 DEC 2022 | |
KL INTERNATIONAL | |||
RADAR DEPARTURES | AD 2-WMKK-6-1 | 23 MAY 2019 | |
RWY14L RNAV (GNSS) PUGER 1A BIKDU 1A SALAX 1A IBUKU 1A PIBOS 1A MITOS 1A ATIMU 1A KIMAT 1A RUSBU 1A | AD 2-WMKK-6-3 | 10 SEP 2021 | |
RWY 14L RNP 1 (GNSS) PUGER 2A BIKDU 2A SALAX 2A IBUKU 2A PIBOS 2A MITOS 2A ATIMU 2A KIMAT 2A RUSBU 2A | AD 2-WMKK-6-7 | 09 MAR 2023 | |
RWY14R RNAV (GNSS) PUGER 1B BIKDU 1B SALAX 1B IBUKU 1B PIBOS 1B MITOS 1BATIMU 1B KIMAT 1B RUSBU 1B | AD 2-WMKK-6-11 | 10 SEP 2021 | |
RWY 14R DEPARTURES FOR SAAS SUBANG | AD 2-WMKK-6-15 |
08 OCT 2024 | |
RWY 14R RNP 1 (GNSS) PUGER 2B BIKDU 2B SALAX 2B IBUKU 2B PIBOS 2B MITOS 2B ATIMU 2B KIMAT 2B RUSBU 2B | AD 2-WMKK-6-17 | 09 MAR 2023 | |
RWY15 RNAV (GNSS) PUGER 1C BIKDU 3C SALAX 1C IBUKU 1C PIBOS 3C MITOS 1C ATIMU 1C KIMAT 1C RUSBU 1C | AD 2-WMKK-6-21 |
09 MAR 2023 | |
RWY 15 RNP 1 (GNSS) PUGER 2C BIKDU 2C SALAX 2C IBUKU 2C PIBOS 2C MITOS 2C ATIMU 2C KIMAT 2C RUSBU 2C | AD 2-WMKK-6-25 | 09 MAR 2023 | |
RWY32R RNAV (GNSS) PUGER 1D BIKDU 1D SALAX 1D IBUKU 1D PIBOS 1D MITOS 1D ATIMU 1D KIMAT 1D RUSBU 1D | AD 2-WMKK-6-30 | 10 SEP 2021 | |
RWY 32R DEPARTURES FOR SAAS SUBANG | AD 2-WMKK-6-35 |
08 OCT 2024 | |
RWY 32R RNP 1 (GNSS) PUGER 2D BIKDU 2D SALAX 2D IBUKU 2D PIBOS 2D MITOS 2D ATIMU 2D KIMAT 2D RUSBU 2D | AD 2-WMKK-6-37 | 09 MAR 2023 | |
RWY 32L RNAV(GNSS) PUGER 1E BIKDU 1E SALAX 1E IBUKU 1E PIBOS 1E MITOS 1E ATIMU 1E KIMAT 1E RUSBU 1E | AD 2-WMKK-6-41 | 30 JAN 2024 | |
RWY 32L RNP 1 (GNSS) PUGER 2E BIKDU 2E SALAX 2E IBUKU 2E PIBOS 2E MITOS 2E ATIMU 2E KIMAT 2E RUSBU 2E | AD 2-WMKK-6-47 | 30 JAN 2024 | |
RWY 33 RNP 1 (GNSS) PUGER 1F BIKDU 1F SALAX 1F IBUKU 1F PIBOS 1F MITOS 1F ATIMU 1F KIMAT 3F RUSBU 1F | AD 2-WMKK-6-51 |
09 MAR 2023 | |
RWY 33 RNP 1 (GNSS) PUGER 2F BIKDU 2F SALAX 2F IBUKU 2F PIBOS 2F MITOS 2F ATIMU 2F KIMAT 2F RUSBU 2F | AD 2-WMKK-6-57 | 09 MAR 2023 | |
KOTA BHARU | |||
RWY 10/28 KOTA BHARU RADAR 1 | AD 2-WMKC-6-1 | 28 FEB 2023 | |
RWY 10 RNAV (GNSS) GUGIT 1A RUPOS 1A OPOMO 1A DUBMU 1A | AD 2-WMKC-6-3 | 28 FEB 2023 | |
RWY 10 OPOMO 1C DUBMU 1C GUGIT 1C RUPOS 1C | AD 2-WMKC-6-7 | 28 FEB 2023 | |
RWY 28 RNAV (GNSS) OPOMO 1B DUBMU 1B GUGIT 1B RUPOS 1B | AD 2-WMKC-6-9 | 28 FEB 2023 | |
RWY 28 OPOMO 1D DUBMU 1D GUGIT 1D RUPOS 1D | AD 2-WMKC-6-13 | 28 FEB 2023 | |
KOTA KINABALU | |||
RWY 02/20 RADAR TWO DEPARTURE | AD 2-WBKK-6-1 |
08 DEC 2022 | |
RWY 02 DEPARTURES (LEFT TURN) RNAV 1 | AD 2-WBKK-6-3 |
08 DEC 2022 | |
RWY 02 DEPARTURES (RIGHT/LEFT TURN) RNAV 1 | AD 2-WBKK-6-7 |
08 DEC 2022 | |
RWY 20 DEPARTURES (RIGHT TURN) RNAV 1 | AD 2-WBKK-6-11 |
08 DEC 2022 | |
RWY 20 DEPARTURES (LEFT TURN) RNAV 1 | AD 2-WBKK-6-15 |
08 DEC 2022 | |
RWY 02 (VOR/DME) ADLEX 1J | AD 2-WBKK-6-17 |
08 DEC 2022 | |
RWY 02 (VOR/DME) ENBAX 1J | AD 2-WBKK-6-19 |
08 DEC 2022 | |
RWY 20 (VOR/DME) ADLEX IK | AD 2-WBKK-6-21 |
08 DEC 2022 | |
RWY 20 (VOR/DME) ENBAX 1K | AD 2-WBKK-6-23 |
08 DEC 2022 | |
KUANTAN | |||
RWY 18/36 KUANTAN RADAR 1 DEP | AD 2-WMKD-6-1 | 28 MAR 2019 | |
RWY 18 ADNUT B PEKAN B GUNBO B KERTEH B | AD 2-WMKD-6-3 | 28 MAR 2019 | |
RWY 36 (RNAV) ADNUT C PEKAN C GUNBO C KERTEH C | AD 2-WMKD-6-5 | 28 MAR 2019 | |
RWY 36 ADNUT A PEKAN A GUNBO A KERTEH A | AD 2-WMKD-6-7 | 28 MAR 2019 | |
KUCHING | |||
RWY 25/07 RADAR DEPARTURE | AD 2-WBGG-6-1 | 15 AUG 2023 | |
RWY 07 (RNAV) ESBAL 1K DEP MOXUN 1J DEP TEMES 1H DEP (VIA PEGDU) | AD 2-WBGG-6-3 |
08 OCT 2024 | |
RWY 07 (RNAV) OROMA 1H DEP LUTMO 1H DEP KIKAK 1J DEP | AD 2-WBGG-6-5 |
08 OCT 2024 | |
RWY 25 (RNAV) AGTEB 1A OLTOB 1B OLTOB 1A IDUNO 1A | AD 2-WBGG-6-7 |
08 OCT 2024 | |
RWY 25 KIKAK 1C DEP KIKAK 1D DEP LUTMO 1C DEP LUTMO 1D DEP OROMA 1C DEP | AD 2-WBGG-6-9 |
08 OCT 2024 | |
ESBAL 1J DEP (VIA RUNVO) | AD 2-WBGG-6-11 |
08 OCT 2024 | |
PAPSA 1H DEP ESBAL 1L DEP | AD 2-WBGG-6-13 |
08 OCT 2024 | |
LUTMO 1J DEP | AD 2-WBGG-6-15 |
08 OCT 2024 | |
| AD 2-WBGG-6-17 |
08 OCT 2024 | |
ESBAL 1F DEP PAPSA 1D DEP | AD 2-WBGG-6-19 |
08 OCT 2024 | |
LANGKAWI | |||
RADAR DEPARTURE | AD 2-WMKL-6-1 | 29 OCT 2021 | |
RWY 21 KAPKO 1D AKRAB 1D ANDOK 1D MULOT 1D RUVTO 1D ISTEL 1D | AD 2-WMKL-6-3 | 29 OCT 2021 | |
RWY 21 RNAV (GNSS) RWY21 RUVTO 1B AKRAB 1B ANDOK 1B ISTEL 1B MULOT 1B KAPKO 1B | AD 2-WMKL-6-5 | 29 OCT 2021 | |
LIMBANG | |||
RWY 04 | AD 2-WBGJ-6-1 | 03 MAR 2022 | |
RWY 22 | AD 2-WBGJ-6-3 | 03 MAR 2022 | |
MALACCA | |||
RADAR DEPARTURE | AD 2-WMKM-6-1 | 29 OCT 2021 | |
RWY 03 RUSBU 2Q OGAKO 2Q DOSIK 2Q SAPAT 2Q IRMIB 2Q | AD 2-WMKM-6-3 | 29 OCT 2021 | |
RWY 03 RNAV (GNSS) RUSBU 1Q DOSIK 1Q IRMIB 1Q OGAKO 1Q SAPAT 1Q | AD 2-WMKM-6-5 | 29 OCT 2021 | |
RWY 21 RUSBU 2R OGAKO 2R DOSIK 2R SAPAT 2R IRMIB 2R | AD 2-WMKM-6-9 | 29 OCT 2021 | |
RWY 21 RNAV (GNSS) RUSBU 1R DOSIK 1R IRMIB 1R OGAKO 1R SAPAT 1R | AD 2-WMKM-6-11 | 29 OCT 2021 | |
MIRI | |||
MIRI RADAR, RADAR DEPARTURE | AD 2-WBGR-6-1 | 02 DEC 2021 | |
RWY 02 ASAKI 1C AROVU 1C BEVDO 1C BIPAS 1C DOXES 1C DUGEV 1C ESLAB 1C EXUGO 1C GODOM 1C | AD 2-WBGR-6-3 | 08 SEP 2022 | |
RWY 02 RNAV (GNSS) ASAKI 1A AROVU 1A BEVDO 1A BIPAS 1A DOXES 1A DUGEV 1A ESLAB 1A EXUGO 1A GODOM 1A | AD 2-WBGR-6-7 | 08 SEP 2022 | |
RWY 20 ASAKI 1D AROVU 1D BEVDO 1D BIPAS 1D DOXES 1D DUGEV 1D ESLAB 1D EXUGO 1D GODOM 1D | AD 2-WBGR-6-11 | 08 SEP 2022 | |
RWY 20 RNAV (GNSS) ASAKI 1B AROVU 1B BEVDO 1B BIPAS 1B DOXES 1B DUGEV 1B ESLAB 1B EXUGO 1B GODOM 1B | AD 2-WBGR-6-15 | 08 SEP 2022 | |
MUKAH | |||
RWY 15 RNAV (GNSS) TOSOD 1J ADGAB 1J BASUV 1J NOLUS 1J PILAX 1J |
AD 2-WBGK-6-1 |
08 DEC 2022 | |
RWY 33 RNAV (GNSS) TOSOD 1K ADGAB 1K BASUV 1K NOLUS 1K PILAX 1K |
AD 2-WBGK-6-5 |
08 DEC 2022 | |
RWY 15 TOSOD 1L ADGAB 1L BASUV 1L NOLUS 1L PILAX 1L |
AD 2-WBGK-6-9 |
08 DEC 2022 | |
RWY 33 TOSOD 1M ADGAB 1M BASUV 1M NOLUS 1M PILAX 1M |
AD 2-WBGK-6-11 |
08 DEC 2022 | |
PENANG | |||
RWY 04/22 PENANG RADAR ONE | AD 2-WMKP-6-1 | 29 OCT 2021 | |
RWY 04 RNAV (GNSS) OMBOK 1A GOGOM 1A UGAMO 1A LUNTU 1A BETNU 1A BOGUK 1A KABOT 1A UDIKO 1A MADUM 1A | AD 2-WMKP-6-3 | 10 SEP 2021 | |
RWY 04 OMBOK 1C BETNU 1C KABOT 1C MADUM 1C LUNTU 1C BOGUK 1C UDIKO 1C | AD 2-WMKP-6-7 | 10 SEP 2021 | |
RWY 22 RNAV (GNSS) OMBOK 1B GOGOM 1B UGAMO 1B LUNTU 1B BETNU 1B BOGUK 1B KABOT 1B UDIKO 1B MADUM 1B | AD 2-WMKP-6-9 | 10 SEP 2021 | |
RWY 22 OMBOK 1D BETNU 1D KABOT 1D MADUM 1D LUNTU 1D BOGUK 1D UDIKO 1D | AD 2-WMKP-6-13 | 10 SEP 2021 | |
SUBANG | |||
RADAR DEPARTURES | AD 2-WMSA-6-1 |
| |
RWY 15 RNAV (GNSS) BIKDU 3L PIBOS 3L RUSBU 3L MITOS 3L SALAX 3L PUGER 3L IBUKU 3L ATIMU 3L
RWY 15 RNAV (GNSS) BIKDU 1L PIBOS 1L KIMAT 1L RUSBU 1L MIOS 1L SALAX 1L PUGER 1L IBUKU 1L ATIMU 1L | AD 2-WMSA-6-3 |
| |
MITOS 2L SALAX 2L PUGER 2L SUKAT 2L | AD 2-WMSA-6-7 |
| |
RWY 33 PULIP 2N PIBOS 2N BATAR 2N MITOS 2N SALAX 2N PUGER 2N SUKAT 2N RWY 33 PULIP 2N PIBOS 2N KIMAT 2N BATAR 2N MITOS 2N SALAX 2N PUGER 2N SUKAT 2N | AD 2-WMSA-6-9 |
| |
SIBU | |||
RWY 13/31 SIBU RADAR 1 DEP |
AD 2-WBGS-6-1 |
08 DEC 2022 | |
RWY 13 TULMA 1G |
AD 2-WBGS-6-3 |
08 DEC 2022 | |
RWY 31 KALAX 1H |
AD 2-WBGS-6-5 |
08 DEC 2022 | |
SANDAKAN | |||
RWY 26 KUDAT 1A | AD 2-WBKS-6-1 |
30 JAN 2024 | |
RWY 08 KUDAT 1D BELDA 1D AKMAR 1D ANKOD 1D LAHAD 1D | AD 2-WBKS-6-3 |
08 DEC 2022 | |
RWY 08 RNAV KUDAT 1B BELDA 1B AKMAR 1B ANKOB 1B LAHAD 1B | AD 2-WBKS-6-5 | 08 SEP 2022 | |
TAWAU | |||
RWY 06/24 TAWAU RADAR 1 | AD 2-WBKW-6-1 | 29 OCT 2021 | |
RWY 24 BAXAL 1A AGIGI 1A AKDEM 1A TAWAU 1A | AD 2-WBKW-6-3 |
01 DEC 2022 | |
RWY 06 TAWAU 1B BAXAL 1B BILUK 1B | AD 2-WBKW-6-5 | 29 OCT 2021 | |
KUALA TERENGGANU | |||
RWY 04 RNAV (GNSS) PALNO A | AD 2-WMKN-6-1 | 25 MAR 2021 | |
RWY 22 RNAV (GNSS) PALNO B | AD 2-WMKN-6-3 | 25 MAR 2021 | |
RWY 04 PALNO C | AD 2-WMKN-6-5 | 25 MAR 2021 | |
RWY 22 PALNO D | AD 2-WMKN-6-7 | 25 MAR 2021 | |
LABUAN | |||
RWY 14 (RNAV 1) LAVED 1R |
AD 2-WBKL-6-1 |
08 DEC 2022 | |
RWY 14 LAVED 1S |
AD 2-WBKL-6-3 |
08 DEC 2022 | |
RWY 32 (RNAV 1) LAVED 1U |
AD 2-WBKL-6-5 |
08 DEC 2022 | |
RWY 32 LAVED 1W |
AD 2-WBKL-6-7 |
08 DEC 2022 | |
RWY 14/32 LABUAN RADAR 1 |
AD 2-WBKL-6-9 |
08 DEC 2022 | |
KERTEH | |||
RWY 34 VOR/DME APATU 1B DEP | AD 2-WMKE-6-1 | 28 FEB 2023 | |
RWY 34 VOR/DME APATU 1C DEP | AD 2-WMKE-6-3 | 28 FEB 2023 | |
RWY 16 VOR/DME APATU 1D DEP | AD 2-WMKE-6-5 | 28 FEB 2023 |
Title of series | Name of Chart | Reference | Date |
---|---|---|---|
Standard Arrival Chart -Instrument - ICAO (STAR) | ALOR SETAR | ||
RWY 04 VOR/DME ARC JERAI 1G TAMOS 1G MULOT 1G KARMI 1G | AD 2-WMKA-7-1 |
16 JUL 2024 | |
RWY 04 RNAV (GNSS) PAYAR 1E JERAI 1E TAMOS 1E KARMI 1E MULOT 1E | AD 2-WMKA-7-3 |
16 JUL 2024 | |
BINTULU | |||
RWY 17 (RNP 1) ADGAB 3A | AD 2-WBGB-7-1 | 03 MAR 2022 | |
RWY 35 (RNP 1) ADGAB 3B EKETO 3B BASUV 3B DUNAS 3B BENLI 3B NOKER 3B | AD 2-WBGB-7-5 | 28 FEB 2023 | |
JOHOR BAHRU | |||
RWY 16 RNAV EMTUV 1E OMKOM 1E PIMOK 1E ADLOV 1E |
AD 2-WMKJ-7-5 |
08 DEC 2022 | |
RWY 16 ARRIVAL (11 DME ARC) ADLOV 1G OMKOM 1G PIMOK 1G EMTUV 1G (TABULAR 1) |
AD 2-WMKJ-7-5 |
08 DEC 2022 | |
KL INTERNATIONAL | |||
RWY32R, 32L, 33, 14L, 14R, 15 RNAV (GNSS) PMS EAST PUGER 1G KAKAK 1G SAROX 1G NIREN 1G PULIP 1G GUPTA 1G SALAX 1G | AD 2-WMKK-7-1 | 10 SEP 2021 | |
RWY32R, 32L, 33, 14L, 14R, 15 RNAV (GNSS) PMS EAST PUGER 1H KAKAK 1H SAROX 1H NIREN 1H PULIP 1H GUPTA 1H SALAX 1H | AD 2-WMKK-7-7 | 10 SEP 2021 | |
RWY32R, 32L, 33 RNAV (GNSS) PMS SOUTH PUGER 1J KAKAK 1J SAROX 1J NIREN 1J PULIP 1J GUPTA 1J SALAX 1J | AD 2-WMKK-7-13 | 10 SEP 2021 | |
RWY32R, 32L, 33 RNP 1 (GNSS) PUGER 3J KAKAK 3J SAROX 3J NIREN 3J PULIP 3J GUPTA 3J SALAX 3J | AD 2-WMKK-7-19 | 23 MAY 2023 | |
RWY14L, 14R, 15 RNAV (GNSS) PMS NORTH PUGER 1K KAKAK 1K SAROX 1K NIREN 1K PULIP 1K GUPTA 1K SALAX 1K | AD 2-WMKK-7-23 | 10 SEP 2021 | |
RWY 14L, 14R, 15 RNAV (GNSS) PUGER 2K KAKAK 2K SAROX 2K NIREN 2K PULIP 2K GUPTA 2K SALAX 2K | AD 2-WMKK-7-27 | 08 SEP 2022 | |
RWY 14L, 14R, 15 RNP 1 (GNSS) PUGER 3K KAKAK 3K SAROX 3K NIREN 3K PULIP 3K GUPTA 3K SALAX 3K | AD 2-WMKK-7-31 | 09 MAR 2023 | |
RWY 32R, 32L, 33 RNAV (GNSS) PUGER 2J KAKAK 2J SAROX 2J NIREN 2J PULIP 2J GUPTA 2J SALAX 2J | AD 2-WMKK-7-35 | 08 SEP 2022 | |
RWY 14L INITIAL APPROACH PROCEDURE VIA PMS EAST / WEST / NORTH | AD 2-WMKK-7-39 | 30 JAN 2024 | |
RWY 14R RNAV (GNSS) INITIAL APPROACH PROCEDURE VIA PMS EAST / WEST / NORTH | AD 2-WMKK-7-41 |
30 JAN 2024 | |
RWY 15 INITIAL APPROACH PROCEDURE VIA PMS EAST / WEST / NORTH | AD 2-WMKK-7-43 |
30 JAN 2024 | |
RWY 32L INITIAL APPROACH PROCEDURE VIA PMS EAST / WEST / SOUTH | AD 2-WMKK-7-45 |
30 JAN 2024 | |
RWY 32R INITIAL APPROACH PROCEDURE VIA PMS EAST / WEST / SOUTH |
AD 2-WMKK-7-47 |
30 JAN 2024 | |
RWY 33 INITIAL APPROACH PROCEDURE VIA PMS EAST / WEST / SOUTH | AD 2-WMKK-7-49 |
30 JAN 2024 | |
KOTA KINABALU | |||
RWY 20 ARRIVALS (WEST) (RNAV 1) ADLEX 1A | AD 2-WBKK-7-1 |
08 DEC 2022 | |
RWY 20 ARRIVALS (EAST) (RNAV 1) ELADO 2A | AD 2-WBKK-7-5 |
07 NOV 2023 | |
RWY 02 ARRIVALS (WEST) (RNAV 1) ELADO 2C | AD 2-WBKK-7-9 |
08 DEC 2022 | |
RWY 02 ARRIVALS (EAST) (RNAV 1) ENBAX 1B | AD 2-WBKK-7-13 |
08 DEC 2022 | |
RWY 02 (VOR/DME) ADLEX 1D | AD 2-WBKK-7-17 |
08 DEC 2022 | |
RWY 02 (VOR/DME) ENBAX 1D | AD 2-WBKK-7-19 |
08 DEC 2022 | |
RWY 20 (VOR/DME) ADLEX 1E | AD 2-WBKK-7-21 |
08 DEC 2022 | |
RWY 20 (VOR/DME) ENBAX 1E | AD 2-WBKK-7-23 |
08 DEC 2022 | |
KUCHING | |||
RWY 07 (RNAV) TEMES 1F ESBAL 1G MOXUN 1F PAPSA 1E | AD 2-WBGG-7-1 |
08 OCT 2024 | |
RWY 07 (RNAV) KIKAK 1F LUTMO 1E OROMA 1F | AD 2-WBGG-7-3 |
08 OCT 2024 | |
RWY 07 (RNAV) KIKAK 1G LUTMO 1F OROMA 1E | AD 2-WBGG-7-5 |
08 OCT 2024 | |
RWY 07 TEMES 1G ARR MOXUN 1G ARR ESBAL 1H ARR PAPSA 1F ARR | AD 2-WBGG-7-7 |
08 OCT 2024 | |
RWY 07 KIKAK 1H LUTMO 1G OROMA 1G | AD 2-WBGG-7-9 |
08 OCT 2024 | |
RWY 25 (RNAV) TEMES 1A ESBAL 1A ESBAL 1B MOXUN 1A | AD 2-WBGG-7-11 |
08 OCT 2024 | |
RWY 25 (RNAV) TEMES 1B ESBAL 1C MOXUN 1B PAPSA 1A | AD 2-WBGG-7-13 |
08 OCT 2024 | |
RWY 25 (RNAV) KIKAK 1A LUTMO 1A OROMA 1A | AD 2-WBGG-7-15 |
08 OCT 2024 | |
RWY 25 TEMES 1C ESBAL 1D MOXUN 1C PAPSA 1B | AD 2-WBGG-7-17 |
08 OCT 2024 | |
RWY 25 (VOR/DME) KIKAK 1B LUTMO 1B OROMA 1B | AD 2-WBGG-7-19 |
08 OCT 2024 | |
KUANTAN | |||
RWY 18 (RNAV) ADNUT D PEKAN D GUNBO D KERTEH D | AD 2-WMKD-7-1 |
23 APR 2024 | |
RWY 18 ADNUT C PEKAN C GUNBO C KERTEH C | AD 2-WMKD-7-3 | 28 MAR 2019 | |
RWY 36 (RNAV) ADNUT B PEKAN B GUNBO B KERTEH B | AD 2-WMKD-7-5 | 28 MAR 2019 | |
RWY 36 ADNUT G PEKAN G GUNBO G KERTEH G | AD 2-WMKD-7-7 | 20 MAY 2021 | |
LANGKAWI | |||
RWY 03 ARRIVAL (15 DME ARC) SAGEL 1G KAPKO 1G VPL 1G AKRAB 1G | AD 2-WMKL-7-1 | 29 OCT 2021 | |
RWY 03 RNAV (GNSS) DAKOV 1E AKRAB 1E KAPKO 1E DALAN 1E VPL 1E | AD 2-WMKL-7-3 | 29 OCT 2021 | |
KUALA TERENGGANU | |||
RWY 04 RNAV 1 (GNSS) PALNO E | AD 2-WMKN-7-1 | 25 MAR 2021 | |
RWY 22 RNAV 1 (GNSS) PALNO F | AD 2-WMKN-7-3 | 08 SEP 2022 | |
RWY 04 PALNO G | AD 2-WMKN-7-5 | 25 MAR 2021 | |
RWY 22 PALNO H | AD 2-WMKN-7-7 | 25 MAR 2021 | |
LIMBANG | |||
RWY 04 (RNAV) | AD 2-WBGJ-7-1 | 03 MAR 2022 | |
RWY 04 VOR/DME | AD 2-WBGJ-7-3 | 03 MAR 2022 | |
RWY 22 (RNAV) | AD 2-WBGJ-7-5 | 03 MAR 2022 | |
RWY 22 VOR/DME | AD 2-WBGJ-7-7 | 03 MAR 2022 | |
TAWAU | |||
RWY 24 (RNAV) AGIGI 1C ANGUR 1A BILUK1A BAXAL 1C | AD 2-WBKW-7-1 |
23 MAY 2023 | |
RWY 24 VOR/DME ARC AGIGI 1H ANGUR 1H BILUK 1H BAXAL 1H | AD 2-WBKW-7-3 |
16 JUL 2024 | |
MALACCA | |||
RWY 03 ARRIVAL (13 DME ARC) AKRUL 2S GUPTA 2S DOSIK 2S VELTU 2S DUMOK 2S INTUR 2S | AD 2-WMKM-7-1 | 29 OCT 2021 | |
RWY 03 RNAV (GNSS) AKRUL 1S GUPTA 1S DOSIK 1S VELTU 1S DUMOK 1S INTUR 1S | AD 2-WMKM-7-3 | 29 OCT 2021 | |
RWY 21 ARRIVAL (15 DME ARC) AKRUL 2T GUPTA 2T DOSIK 2T VELTU 2T DUMOK 2T INTUR 2T | AD 2-WMKM-7-5 | 29 OCT 2021 | |
RWY 21 RNAV (GNSS) AKRUL 1T GUPTA 1T DOSIK 1T VELTU 1T DUMOK 1T INTUR 1T | AD 2-WMKM-7-9 | 29 OCT 2021 | |
MIRI | |||
RWY 02 ARRIVAL (11 DME ARC) ASAKI 1G BEVDO 1G BIPAS 1G DOXES 1G DUGEV 1G ESLAB 1G EXUGO 1G GODOM 1G | AD 2-WBGR-7-1 | 08 SEP 2022 | |
RWY 02 RNAV (GNSS) ASAKI 1E BEVDO 1E BIPAS 1E DOXES 1E DUGEV 1E ESLAB 1E EXUGO 1E GODOM 1E | AD 2-WBGR-7-5 | 02 DEC 2021 | |
RWY 20 ARRIVAL (12 DME ARC) ASAKI 1H BEVDO 1H BIPAS 1H DOXES 1H DUGEV 1H ESLAB 1H EXUGO 1H GODOM 1H | AD 2-WBGR-7-9 | 08 SEP 2022 | |
RWY 20 RNAV (GNSS) ASAKI 1F BEVDO 1F BIPAS 1F DOXES 1F DUGEV 1F GODOM 1F EXUGO 1F ESLAB 1F | AD 2-WBGR-7-13 | 08 SEP 2022 | |
MUKAH | |||
RWY 15 RNAV (GNSS) TOSOD 1N ADGAB 1N BASUV 1N NOLUS 1N PILAX 1N |
AD 2-WBGK-7-1 |
08 DEC 2022 | |
RWY 33 RNAV (GNSS) TOSOD 1P ADGAB 1P BASUV 1P NOLUS 1P PILAX 1P |
AD 2-WBGK-7-5 |
08 DEC 2022 | |
RWY 15 VOR/DME ARC TOSOD 1Q ADGAB 1Q BASUV 1Q NOLUS 1Q PILAX 1Q |
AD 2-WBGK-7-9 |
08 DEC 2022 | |
RWY 33 VOR/DME ARC TOSOD 1R ADGAB 1R BASUV 1R NOLUS 1R PILAX 1R |
AD 2-WBGK-7-11 |
08 DEC 2022 | |
PENANG | |||
RWY 04 RNAV (GNSS) OMBOK 1E LUNTU 1E BETNU 1E GORVU 1E MADUM 1E | AD 2-WMKP-7-1 | 10 SEP 2021 | |
RWY 22 RNAV (GNSS) OMBOK 1F BETNU 1F MADUM 1F LUNTU 1F GORVU 1F | AD 2-WMKP-7-5 | 10 SEP 2021 | |
SUBANG | |||
CALEDONIAN ONE ARRIVAL | AD 2-WMSA-7-1 | 03 MAR 2022 | |
RWY 15 RNAV 1 (GNSS) PUGER 2M NIREN 2M KAKAK 2M PULIP 2M SAROX 2M GUPTA 2M SALAX 2M |
AD 2-WMSA-7-3 |
08 OCT 2024 | |
SIBU | |||
RWY 13 RNAV (VOR/DME) KALAX 1A |
AD 2-WBGS-7-1 |
08 DEC 2022 | |
RWY 13 (VOR/DME) KALAX 1E |
AD 2-WBGS-7-3 |
08 DEC 2022 | |
RWY 13 VOR/DME ARC KALAX 1C |
AD 2-WBGS-7-5 |
08 DEC 2022 | |
RWY 31 RNAV (VOR/DME) TULMA 1B |
AD 2-WBGS-7-7 |
08 DEC 2022 | |
RWY 31 (VOR/DME) TULMA 1F |
AD 2-WBGS-7-9 |
08 DEC 2022 | |
RWY 31 VOR/DME ARC TULMA 1D |
AD 2-WBGS-7-11 |
08 DEC 2022 | |
SANDAKAN | |||
RWY 08 VOR/DME ARC KUDAT 1H BELDA 1H AKMAR 1H ANKOB 1H LAHAD 1H | AD 2-WBKS-7-1 |
08 DEC 2022 | |
RWY 08 RNAV KUDAT 1F BELDA 1F AKMAR 1F ANKOD 1F LAHAD 1F | AD 2-WBKS-7-3 |
08 DEC 2022 | |
KOTA BHARU | |||
RWY 10 RNAV(GNSS) GUGIT 1E RUPOS 1E OPOMO 1E | AD 2-WMKC-7-1 | 28 FEB 2023 | |
RWY 28 RNAV(GNSS) GUGIT 1F RUPOS 1F OPOMO 1F | AD 2-WMKC-7-5 | 28 FEB 2023 | |
KERTEH | |||
RWY 34 VOR/DME APATU 1A | AD 2-WMKE-7-1 | 16 JUL 2024 | |
HELICOPTER ARRIVAL GATES / ROUTES | AD 2-WMKE-7-3 | 28 FEB 2023 | |
IPOH | |||
RWY 04 RNAV (GNSS) GUMDA 2E NITIS 2E SOTRO 2E MINOP 2E TEPUS 2E DUDAD 1E | AD 2-WMKI-7-1 | 08 OCT 2024 | |
RWY 04 (VOR/DME ARC) GUMDA 2G NITIS 2G SOTRO 2G MINOP 2G TEPUS 2G DUDAD 1G | AD 2-WMKI-7-5 | 08 OCT 2024 | |
LABUAN | |||
RWY 14 (RNAV 1) LAVED 1P |
AD 2-WBKL-7-1 |
08 DEC 2022 | |
RWY 32 (RNAV 1) LAVED 1T |
AD 2-WBKL-7-5 |
08 DEC 2022 |
Title of series | Name of Chart | Reference | Date |
---|---|---|---|
Instrument Approach Chart - ICAO (IAC) | ALOR SETAR | ||
RWY 04 VOR Z (13 DME ARC) | AD 2-WMKA-8-1 |
16 JUL 2024 | |
RWY 04 VOR Y (FROM OVERHEAD VAS VOR) | AD 2-WMKA-8-3 |
16 JUL 2024 | |
RWY 04 ILS Z OR LOC Z | AD 2-WMKA-8-5 |
16 JUL 2024 | |
RWY 04 ILS Y OR LOC Y (FROM OVERHEAD VAS VOR) | AD 2-WMKA-8-7 |
16 JUL 2024 | |
RWY 04 RNP Z (AR) | AD 2-WMKA-8-9 |
16 JUL 2024 | |
RWY 04 RNP Y | AD 2-WMKA-8-13 |
16 JUL 2024 | |
BINTULU | |||
RWY 17 ILS Z OR LOC Z (12 DME ARC) | AD 2-WBGB-8-1 | 03 MAR 2022 | |
RWY 17 VOR Z (12 DME ARC) | AD 2-WBGB-8-3 | 03 MAR 2022 | |
RWY 17 RNP Y |
AD 2-WBGB-8-5 |
08 DEC 2022 | |
RWY 35 VOR Z (16 DME ARC) | AD 2-WBGB-8-7 | 03 MAR 2022 | |
RWY 35 RNP Y | AD 2-WBGB-8-9 | 01 DEC 2022 | |
RWY 17 RNP | AD 2-WBGB-8-11 | 01 DEC 2022 | |
RWY 35 RNP Z (AR) | AD 2-WBGB-8-13 | 01 DEC 2022 | |
IPOH | |||
RWY 04 ILS Z / LOC Z | AD 2-WMKI-8-1 | 08 OCT 2024 | |
RWY 04 ILS Y / LOC Y | AD 2-WMKI-8-3 | 08 OCT 2024 | |
RWY 04 RNP Z | AD 2-WMKI-8-5 | 08 OCT 2024 | |
RWY 04 RNP Y | AD 2-WMKI-8-9 | 08 OCT 2024 | |
RWY 04 VOR Z (VOR/DME ARC) | AD 2-WMKI-8-13 | 08 OCT 2024 | |
RWY 04 VOR Y | AD 2-WMKI-8-15 | 08 OCT 2024 | |
JOHOR BAHRU | |||
RWY 16 ILS Z OR LOC Z |
AD 2-WMKJ-8-1 |
08 DEC 2022 | |
RWY 16 ILS Y OR LOC Y |
AD 2-WMKJ-8-3 |
08 DEC 2022 | |
RWY 16 ILS X OR LOC X |
AD 2-WMKJ-8-5 |
08 DEC 2022 | |
RWY 16 ILS W OR LOC W |
AD 2-WMKJ-8-7 |
08 DEC 2022 | |
RWY 16 VOR Z |
AD 2-WMKJ-8-9 |
08 DEC 2022 | |
RWY 16 VOR Y |
AD 2-WMKJ-8-11 |
08 DEC 2022 | |
RWY 16 VOR X |
AD 2-WMKJ-8-13 |
08 DEC 2022 | |
RWY 16 VOR W |
AD 2-WMKJ-8-15 |
08 DEC 2022 | |
RWY 16 RNP Y |
AD 2-WMKJ-8-17 |
08 DEC 2022 | |
RWY 16 RNP X |
AD 2-WMKJ-8-21 |
08 DEC 2022 | |
RWY 16 RNP Z (AR) |
AD 2-WMKJ-8-25 |
08 DEC 2022 | |
RWY 34 RNP Z (AR) |
AD 2-WMKJ-8-29 |
08 DEC 2022 | |
KERTEH | |||
RWY 34 ILS Z OR LOC Z | AD 2-WMKE-8-1 | 28 FEB 2023 | |
RWY 34 ILS Y OR LOC Y | AD 2-WMKE-8-3 | 28 FEB 2023 | |
RWY 34 VOR Z | AD 2-WMKE-8-5 | 28 FEB 2023 | |
RWY 34 VOR Y | AD 2-WMKE-8-7 | 28 FEB 2023 | |
RWY 34 ILS X OR LOC X (CAT H) | AD 2-WMKE-8-9 | 16 JUL 2024 | |
RWY 34 VOR X (CAT H) | AD 2-WMKE-8-11 | 28 FEB 2023 | |
RWY 16 VOR Z | AD 2-WMKE-8-13 | 28 FEB 2023 | |
RWY 16 VOR Y | AD 2-WMKE-8-15 | 28 FEB 2023 | |
RWY 16 VOR X (CAT H) | AD 2-WMKE-8-17 | 28 FEB 2023 | |
KL INTERNATIONAL | |||
RWY 14L ILS OR LOC | AD 2-WMKK-8-1 | 10 SEP 2021 | |
RWY 14L RNP Y | AD 2-WMKK-8-3 | 16 JUL 2024 | |
RWY 14L RNP X | AD 2-WMKK-8-5 |
30 JAN 2024 | |
RWY 14L VOR/DME | AD 2-WMKK-8-7 | 01 DEC 2022 | |
RWY 14R ILS OR LOC | AD 2-WMKK-8-9 | 16 JUL 2024 | |
RWY 14R RNP Y | AD 2-WMKK-8-11 | 08 SEP 2022 | |
RWY 14R RNP X | AD 2-WMKK-8-13 | 9 MAR 2023 | |
RWY 15 ILS OR LOC | AD 2-WMKK-8-15 | 10 SEP 2021 | |
RWY 15 RNP Y | AD 2-WMKK-8-17 | 08 SEP 2022 | |
RWY 15 RNP X | AD 2-WMKK-8-19 |
30 JAN 2024 | |
RWY 15 VOR/DME | AD 2-WMKK-8-21 | 01 DEC 2022 | |
RWY 32L ILS OR LOC | AD 2-WMKK-8-23 | 10 SEP 2021 | |
RWY 32L RNP Y | AD W-WMKK-8-25 | 08 SEP 2022 | |
RWY 32L RNP X | AD 2-WMKK-8-27 | 9 MAR 2023 | |
RWY 32R ILS OR LOC | AD 2-WMKK-8-29 | 10 SEP 2021 | |
RWY 32R RNP Z (AR) | AD 2-WMKK-8-31 |
23 APR 2024 | |
RWY 32R RNP Y | AD 2-WMKK-8-35 |
15 SEP 2022 | |
RWY 32R RNP X | AD 2-WMKK-8-37 | 9 MAR 2023 | |
RWY 32R VOR/DME | AD 2-WMKK-8-39 | 01 DEC 2022 | |
RWY 33 ILS OR LOC | AD 2-WMKK-8-41 | 10 SEP 2021 | |
RWY 33 RNP Z (AR) | AD 2-WMKK-8-43 |
23 APR 2024 | |
RWY 33 RNP Y | AD 2-WMKK-8-47 | 08 SEP 2022 | |
RWY 33 RNP X | AD 2-WMKK-8-49 | 9 MAR 2023 | |
RWY 33 VOR/DME | AD 2-WMKK-8-51 | 01 DEC 2022 | |
KOTA BHARU | |||
RWY 10 ILS/DME Z OR LOC/DME Z |
AD 2-WMKC-8-1 | 28 FEB 2023 | |
RWY 10 VOR Z (10 DME ARC) |
AD 2-WMKC-8-3 |
28 FEB 2023 | |
RWY 28 VOR Z (10 DME ARC) |
AD 2-WMKC-8-5 | 28 FEB 2023 | |
RWY 10 RNP Z (AR) |
AD 2-WMKC-8-7 |
28 FEB 2023 | |
RWY 28 RNP Z (AR) |
AD 2-WMKC-8-11 |
28 FEB 2023 | |
RWY 10 RNP Y |
AD 2-WMKC-8-15 |
28 FEB 2023 | |
RWY 28 RNP Y |
AD 2-WMKC-8-17 |
28 FEB 2023 | |
KOTA KINABALU | |||
RWY 02 ILS Y(FROM OVERHEAD VOR/ DME VJN) | AD 2-WBKK-8-1 |
08 DEC 2022 | |
RWY 02 ILS Z OR LOC Z | AD 2-WBKK-8-3 |
08 DEC 2022 | |
RWY 02 VOR Z | AD 2-WBKK-8-5 | 26 MAY 2022 | |
RWY 02 VOR Y | AD 2-WBKK-8-7 |
15 SEP 2022 | |
RWY 20 ILS Z OR LOC Z | AD 2-WBKK-8-9 |
08 DEC 2022 | |
RWY 20 ILS Y OR LOC Y | AD 2-WBKK-8-11 |
08 DEC 2022 | |
RWY 20 VOR Z | AD 2-WBKK-8-13 |
15 SEP 2022 | |
RWY 20 VOR Y | AD 2-WBKK-8-15 |
08 DEC 2022 | |
RWY 02 RNP Y | AD 2-WBKK-8-17 |
01 DEC 2022 | |
RWY 20 RNP Y | AD 2-WBKK-8-19 |
01 DEC 2022 | |
RWY 02 RNP Z (AR) | AD 2-WBKK-8-21 |
01 DEC 2022 | |
RWY 20 RNP Z (AR) | AD 2-WBKK-8-27 |
01 DEC 2022 | |
KUALA TERENGGANU | |||
RWY 04 ILS Z OR LOC Z | AD 2-WMKN-8-1 | 26 MAY 2022 | |
RWY 04 ILS Y OR LOC Y | AD 2-WMKN-8-3 | 25 MAR 2021 | |
RWY 04 VOR Z | AD 2-WMKN-8-5 | 26 MAY 2022 | |
RWY 04 VOR Y | AD 2-WMKN-8-7 | 23 APR 2024 | |
RWY 22 VOR Z | AD 2-WMKN-8-9 |
08 DEC 2022 | |
RWY 22 VOR Y | AD 2-WMKN-8-11 |
15 SEP 2022 | |
RWY 04 RNAV (RNP) Z | AD 2-WMKN-8-13 |
15 SEP 2022 | |
RWY 22 RNAV (RNP) Z | AD 2-WMKN-8-17 |
15 SEP 2022 | |
RWY 04 RNAV (GNSS) Y | AD 2-WMKN-8-21 | 20 MAY 2021 | |
RWY 22 RNAV (GNSS) Y | AD 2-WMKN-8-23 | 20 MAY 2021 | |
KUANTAN | |||
RWY 18 VOR Z (CAT C/D) | AD 2-WMKD-8-1 | 28 MAR 2019 | |
RWY 18 VOR Y (15 DME ARC ARR) | AD 2-WMKD-8-3 |
16 JUL 2024 | |
RWY 36 ILS Z (RNAV STAR ARR) | AD 2-WMKD-8-5 | 28 MAR 2019 | |
RWY 36 ILS Y (15 DME ARC ARR) | AD 2-WMKD-8-7 | 26 MAR 2020 | |
RWY 36 ILS X (FROM OVERHEAD VKN VOR) | AD 2-WMKD-8-9 | 26 MAR 2020 | |
RWY 36 VOR | AD 2-WMKD-8-11 | 28 MAR 2019 | |
RWY 18 TACAN 1 (HI/LO) | AD 2-WMKD-8-13 | 03 MAR 2022 | |
RWY 36 TACAN 2 (HI/LO) | AD 2-WMKD-8-15 | 26 MAY 2022 | |
RWY 36 TACAN 3 (HI/LO) | AD 2-WMKD-8-17 | 26 MAY 2022 | |
RWY 18 TACAN 4 (HI/LO) | AD 2-WMKD-8-19 | 28 MAR 2019 | |
KUCHING | |||
RWY 07 VOR Z (FROM STAR) | AD 2-WBGG-8-1 |
08 OCT 2024 | |
RWY 07 VOR Y (FROM OVERHEAD VKG) | AD 2-WBGG-8-3 |
15 AUG 2023 | |
RWY 25 ILS Z/LOC Z (FROM STAR) | AD 2-WBGG-8-5 |
15 AUG 2023 | |
RWY 25 ILS Y/LOC Y (FROM OVERHEAD VKG) | AD 2-WBGG-8-7 |
15 AUG 2023 | |
RWY 25 VOR Z (FROM EGOMO) | AD 2-WBGG-8-9 |
15 AUG 2023 | |
RWY 07 RNP Z (AR) | AD 2-WBGG-8-11 |
01 DEC 2022 | |
RWY 25 RNP Z (AR) | AD 2-WBGG-8-17 |
08 OCT 2024 | |
LAHAD DATU | |||
RWY 29 LOCATOR | AD 2-WBKD-8-1 | 03 MAR 2022 | |
LABUAN | |||
RWY 14 ILS Z OR LOC Z (15 DME ARC) |
AD 2-WBKL-8-1 |
08 DEC 2022 | |
RWY 14 VOR Z (15 DME ARC) |
AD 2-WBKL-8-3 |
08 DEC 2022 | |
RWY 14 RNP Y |
AD 2-WBKL-8-5 |
08 DEC 2022 | |
RWY 32 VOR Z (14 DME ARC) |
AD 2-WBKL-8-7 |
08 DEC 2022 | |
RWY 32 RNP Y |
AD 2-WBKL-8-9 |
08 DEC 2022 | |
RWY 14 RNP Z (AR) |
AD 2-WBKL-8-11 |
08 DEC 2022 | |
RWY 32 RNP Z (AR) |
AD 2-WBKL-8-13 |
08 DEC 2022 | |
LANGKAWI | |||
RWY 03 ILS Z OR LOC Z |
AD 2-WMKL-8-1 |
23 FEB 2022 | |
RWY 03 ILS Y OR LOC Y (CAT A & B ONLY) |
AD 2-WMKL-8-3 |
23 FEB 2022 | |
RWY 03 VOR Z (15 DME ARC) |
AD 2-WMKL-8-5 |
23 FEB 2022 | |
RWY 03 VOR Y (CAT A & B ONLY) |
AD 2-WMKL-8-7 |
23 FEB 2022 | |
RWY 03 RNP Z (AR) |
AD 2-WMKL-8-9 |
23 FEB 2022 | |
RWY 03 RNP Y |
AD 2-WMKL-8-11 |
23 FEB 2022 | |
LIMBANG | |||
RWY 04 RUNAM VOR/DME Arc | AD 2-WBGJ-8-1 | 03 MAR 2022 | |
RWY 04 VOR/DME | AD 2-WBGJ-8-3 | 03 MAR 2022 | |
RWY 04 VOR | AD 2-WBGJ-8-5 | 03 MAR 2022 | |
RWY 22 RUNAM VOR/DME Arc | AD 2-WBGJ-8-7 | 03 MAR 2022 | |
RWY 22 VOR/DME |
AD 2-WBGJ-8-9 |
08 DEC 2022 | |
RWY 22 VOR | AD 2-WBGJ-8-11 | 03 MAR 2022 | |
MALACCA | |||
RWY 03 ILS Z OR LOC Z | AD 2-WMKM-8-1 | 28 FEB 2023 | |
RWY 03 ILS Y OR LOC Y (FROM OVERHEAD VMK VOR) | AD 2-WMKM-8-3 |
23 MAY 2023 | |
RWY 03 VOR Z (13 DME ARC) FROM STAR | AD 2-WMKM-8-5 | 28 FEB 2023 | |
RWY 03 VOR Y (FROM OVERHEAD VMK VOR) | AD 2-WMKM-8-7 | 28 FEB 2023 | |
RWY 03 RNP Y | AD 2-WMKM-8-9 | 28 FEB 2023 | |
RWY 21 VOR Z (FROM STAR) | AD 2-WMKM-8-13 | 28 FEB 2023 | |
RWY 21 VOR Y (CAT C) (FROM STAR) | AD 2-WMKM-8-15 | 28 FEB 2023 | |
RWY 21 VOR X (CAT A & B) (FROM OVERHEAD VMK VOR) | AD 2-WMKM-8-17 | 28 FEB 2023 | |
RWY 21 RNP Y | AD 2-WMKM-8-19 | 28 FEB 2023 | |
MIRI | |||
RWY 02 ILS Z OR LOC Z | AD 2-WBGR-8-1 | 08 SEP 2022 | |
RWY 02 ILS Y OR LOC Y | AD 2-WBGR-8-3 | 08 SEP 2022 | |
RWY 02 VOR Z | AD 2-WBGR-8-5 | 02 DEC 2021 | |
RWY 02 VOR Y | AD 2-WBGR-8-7 |
08 SEP 2022 | |
RWY 20 VOR Z | AD 2-WBGR-8-9 | 08 SEP 2022 | |
RWY 20 VOR Y | AD 2-WBGR-8-11 | 08 SEP 2022 | |
RWY 02 RNP Y | AD 2-WBGR-8-13 |
01 DEC 2022 | |
RWY 20 RNP Y | AD 2-WBGR-8-15 |
01 DEC 2022 | |
RWY 02 VOR CAT H (HELICOPTER) | AD 2-WBGR-8-17 |
23 APR 2024 | |
RWY 20 VOR CAT H (HELICOPTER) | AD 2-WBGR-8-19 | 08 SEP 2022 | |
RWY 02 RNP Z (AR) | AD 2-WBGR-8-21 |
01 DEC 2022 | |
RWY 20 RNP Z (AR) | AD 2-WBGR-8-25 |
01 DEC 2022 | |
MUKAH | |||
RWY 15 RNP Z | AD 2-WBGK-8-1 |
08 DEC 2022 | |
RWY 33 RNP Z | AD 2-WBGK-8-3 |
08 DEC 2022 | |
RWY 15 VOR Z |
AD 2-WBGK-8-5 |
08 DEC 2022 | |
RWY 33 VOR Z |
AD 2-WBGK-8-7 |
08 DEC 2022 | |
RWY 15 VOR Y |
AD 2-WBGK-8-9 |
08 DEC 2022 | |
RWY 33 VOR Y |
AD 2-WBGK-8-11 |
08 DEC 2022 | |
PENANG | |||
RWY 04 VOR Z (12 DME ARC) | AD 2-WMKP-8-1 | 29 OCT 2021 | |
RWY 22 VOR Z (15 DME & 17 DME ARC) | AD 2-WMKP-8-3 | 26 MAY 2022 | |
RWY 04 ILS Z OR LOC Z (12 DME ARC) | AD 2-WMKP-8-5 | 29 OCT 2021 | |
RWY 04 RNP Z (AR) | AD 2-WMKP-8-7 |
01 DEC 2022 | |
RWY 22 RNP Z (AR) | AD 2-WMKP-8-11 |
01 DEC 2022 | |
RWY 04 RNP Y | AD 2-WMKP-8-17 |
01 DEC 2022 | |
RWY 22 RNP Y | AD 2-WMKP-8-21 |
01 DEC 2022 | |
SANDAKAN | |||
RWY 08 ILS Z OR LOC Z | AD 2-WBKS-8-1 |
08 DEC 2022 | |
RWY 08 ILS Y OR LOC Y | AD 2-WBKS-8-3 |
16 JUL 2024 | |
RWY 08 VOR/DME Z | AD 2-WBKS-8-5 |
08 DEC 2022 | |
RWY 08 VOR/DME Y | AD 2-WBKS-8-7 | 08 DEC 2022 | |
RWY 08 RNP Y | AD 2-WBKS-8-9 |
08 DEC 2022 | |
RWY 26 VOR/DME | AD 2-WBKS-8-13 |
15 SEP 2022 | |
RWY 26 VOR (CAT A & B) | AD 2-WBKS-8-15 |
15 SEP 2022 | |
RWY 26 VOR (CAT C & D) | AD 2-WBKS-8-17 |
15 SEP 2022 | |
RWY 26 RNP Z (AR) | AD 2-WBKS-8-19 |
30 JAN 2024 | |
RWY 26 RNAV (RNP) Z | AD 2-WBKS-8-23 | 08 SEP 2022 | |
SIBU | |||
RWY 13 VOR/ILS/DME | AD 2-WBGS-8-1 | 08 SEP 2022 | |
RWY 13 ILS/DME | AD 2-WBGS-8-3 | 08 SEP 2022 | |
RWY 13 VOR/DME | AD 2-WBGS-8-5 | 08 DEC 2022 | |
RWY 31 VOR/DME (FROM STAR ARR) | AD 2-WBGS-8-7 | 08 DEC 2022 | |
RWY 31 VOR/DME | AD 2-WBGS-8-9 | 08 DEC 2022 | |
RWY 13 RNP Z (AR) | AD 2-WBGS-8-11 | 01 DEC 2022 | |
RWY 31 RNP Z (AR) | AD 2-WBGS-8-15 | 01 DEC 2022 | |
SUBANG | |||
RWY 15 ILS OR LOC | AD 2-WMSA-8-1 |
08 OCT 2024
01 DEC 2022 | |
RWY 15 NDB | AD 2-WMSA-8-3 |
08 OCT 2024 | |
RWY 15 RNP Y | AD 2-WMSA-8-5 |
08 OCT 2024 | |
RWY 33 RNP Y | AD 2-WMSA-8-7 |
08 OCT 2024 | |
TAWAU | |||
RWY 06 VOR | AD 2-WBKW-8-1 | 29 OCT 2021 | |
RWY 24 VOR |
AD 2-WBKW-8-3 |
08 DEC 2022 | |
RWY 24 ILS OR LOC | AD 2-WBKW-8-5 | 16 JUL 2024 | |
RWY 06 RNP Z (AR) | AD 2-WBKW-8-7 |
01 DEC 2022 | |
RWY 24 RNP Z (AR) | AD 2-WBKW-8-11 |
01 DEC 2022 |
Title of series | Name of Chart | Reference | Date |
---|---|---|---|
Enroute Chart - ICAO |
ENROUTE CHART- MALAYSIAN AIRSPACE - ICAO |
ENR 6-3 |
16 JUL 2024 |
Title of series | Name of Chart | Reference | Date |
---|---|---|---|
World Aeronautical Chart | WORLD AERONAUTICAL CHART - WAC 2858 - NORTH NATUNA ISLAND | ENR 6-19 | 16 AUG 2018 |
WORLD AERONAUTICAL CHART - WAC 2859 - PENANG ISLAND | ENR 6-21 | 16 AUG 2018 | |
WORLD AERONAUTICAL CHART - WAC 2861 - CAPE SIRIK | ENR 6-23 | 16 AUG 2018 |
NIL