ContactPost: CIVIL AVIATION AUTHORITY OF MALAYSIA Tel: 6-03-8529 1318 Fax: 6-03-8529 1310 AFS: WMKKYAYS Email: ais@caam.gov.my URL: aip.caam.gov.my | AIC for Malaysia | AIC 01/2024 Effective from 16 JAN 2024 to PERM Published on 16 JAN 2024 |
Lateral
50 NM lateral separation minima will be applied between aircraft which are approved for RNP 10/RNP 4.
23 NM lateral separation minima will be applied between aircraft which are approved for RNP 4/RNP 2.
Longitudinal
50 NM longitudinal separation minima will be applied between aircraft which are approved for RNP 10/RNP 4.
30 NM longitudinal separation minima will be applied between aircraft which are approved for RNP 4/RNP 2.
Route | Segment |
---|---|
P574 | Between ANSAX and NOPEK |
N571 | Between GUNIP and IGOGU |
N571/Y338/L510 (W) | Between GUNIP and EMRAN |
L510/P628 (E) | Between EMRAN and VPL |
P628 | Between VPL and IGREX |
L645 | Between SAPAM and SAMAK |
Table 2.1
Note: Information on the performance-based communication and surveillance (PBCS) concept and guidance material on its implementation are contained in the Performance-based Communication and Surveillance (PBCS) Manual (ICAO Doc 9869) and CAGM 6008 (VI) - NAT HLA, PBCS, CPDLC & ADS.
Required Navigation Performance (RNP) | FANS 1/A CPDLC ADS-C | RCP240 | RSP180 | |||
---|---|---|---|---|---|---|
10 | 4 | 2 | ||||
50NM longitudinal separation | YES | YES | - | YES | YES | YES |
30NM longitudinal separation | - | YES | YES | |||
23 NM lateral separation | - | YES | YES |
Table 3.1
Authorised for RNP 10;
Authorised for RNP 4; or
Authorised for RNP 2;
Equipped with and operating FANS 1/A CPDLC and ADS-C; and
Authorised for RCP 240 and RSP 180.
be provided with communication equipment that will enable it to operate in accordance with the prescribed RCP and RSP specification(s);
have information relevant to the aircraft RCP and RSP specification capabilities listed in the flight manual or other aircraft documentation approved by the State of Registry;
have information relevant to the aircraft RCP and RSP specification capabilities included in the Minimum Equipment List (MEL); and
be authorised by the CAAM for operations in such airspace for local operators. For foreign operators, operations shall be approved by the State Authority
normal and abnormal procedures, including contingency procedures;
flight crew qualification and proficiency requirements, in accordance with appropriate RCP/RSP specifications;
a training programme for relevant personnel consistent with the intended operations;
appropriate maintenance procedures to ensure continued airworthiness, in accordance with appropriate RCP and RSP specifications.
the equipment in accordance with the required communication performance;
identify the specific aircraft to be used for the operations for which approval is sought;
demonstrate that any aeroplane so identified is appropriately equipped to perform in accordance with the required communication performance specified by the appropriate air traffic service authority for the airspace or along the route for which the approval is sought; and
specify the airspace or routes for which approval is sought.
receiving the reports of observed communication performance issued by monitoring programmes established in accordance with Annex 11, Chapter 3, para 3.3.5.2; and
taking immediate corrective action for individual aircraft, aircraft types or operators, identified in such reports as not complying with the RCP and RSP specification(s).
Indicate in item 10 letters:
ITEM 10 | DESCRIPTOR |
---|---|
RNP specification | R |
RCP240 | P2 |
CPDLC ATN VDL Mode 2 (ATN B1) | J1 |
CPDLC FANS 1/A HFDL | J2 |
CPDLC FANS 1/A VDL Mode 0/A | J3 |
CPDLC FANS 1/A VDL Mode 2 | J4 |
CPDLC FANS 1/A SATCOM (INMARSAT) | J5 |
CPDLC FANS 1/A SATCOM (MTSAT) | J6 |
CPDLC FANS 1/A SATCOM (Iridium) | J7 |
ADS-C with FANS 1/A capabilities | D1 |
ADS-C with ATN | G1 |
Table 5.1
Indicate in item 18:
ITEM 18 | DESCRIPTOR |
---|---|
RNP10 | PBN/A1 |
RNP 4 | PBN/L1 |
RNP 2 | NAV/RNP 2 |
RSP180 | SUR/RSP180 |
Table 5.2
Phase 1 (As soon as possible):
50 NM longitudinal and 50 NM lateral performance-based separation to be applied between pair of RNP 10/ RNP 4 approved aircraft.
Phase 2 (Tentatively by 1 March 2024):
ADS-C/CPDLC mandate.
Trial implementation of 30 NM longitudinal / 23 NM lateral performance-based separation between any pair or combination of RNP 4 / RNP 2 approved aircraft.
Phase 3 (Tentatively by March 2026):
Permanent implementation of 30 NM longitudinal / 23 NM lateral performance-based separation.
Flight Operations Division
ops.pbcs@caam.gov.my